Skip to content
PARTIAL DISCHARGE & ELECTRICAL DIAGNOSTICSABU DHABI HEADQUARTERS +971 2 5513114
DigiStanoTalk to an engineer
Partial discharge testing

Partial discharge testing

Find insulation activity before it becomes an assumption.

DigiStano provides online and offline PD assessment, diagnostic investigations and monitoring support for critical electrical assets across five GCC markets.

Testing approaches

Choose the approach after defining the question.

01

Online assessment

Measurements under operating conditions where suitable sensors, access and site arrangements permit.

02

Offline assessment

Testing with the asset out of service and connected to an agreed test arrangement.

03

Temporary monitoring

Measurements over time to examine activity patterns under changing operating conditions.

Methods, measurement points, applicable standards and assessment criteria are agreed for the individual asset and project specification.

Before the site visit

Define a scope you can review.

Share the asset list, rated voltage, site, objective, access constraints, outage windows and any previous reports.

Open the project checklist
  1. Review the asset

    Confirm equipment, history and the decision the assessment should support.

  2. Agree the test plan

    Document access, operating conditions, measurement arrangement and responsibilities.

  3. Record the context

    Capture relevant test or operating conditions with the observations.

  4. Explain the findings

    Report observations, interpretation, limitations and agreed follow-up.

Regional presence

Local understanding. Regional reach.

Headquartered in Abu Dhabi, with offices in the UAE, Saudi Arabia and Bahrain. We coordinate services across five GCC markets.

AE

United Arab Emirates

Headquarters · Abu Dhabi

SA

Saudi Arabia

Office · Al Khobar

BH

Bahrain

Office · Manama

OM

Oman

Service coverage

QA

Qatar

Service coverage

Common questions

Planning a PD assessment.

Where does DigiStano provide PD testing?

DigiStano provides partial discharge testing in the UAE, Saudi Arabia, Oman, Qatar and Bahrain. Our headquarters are in Abu Dhabi, with offices in the UAE, Saudi Arabia and Bahrain.

Which assets can you assess?

Our PD service covers GIS and switchgear, MV/HV cables, power and distribution transformers, motors and generators. The measurement arrangement is selected for the asset and project objective.

Will the equipment need to be shut down?

Offline testing requires an outage. Online measurements may be possible where suitable access and site arrangements permit. Installing sensors or making connections can still require an outage.

How much does partial discharge testing cost?

Pricing depends on asset type and quantity, rated voltage, scope, site location, access, outage arrangements and reporting needs. Share your asset list and preferred dates for a project-specific proposal.

How long does a PD survey take?

Duration depends on the number of assets, measurement access, interference, operating conditions and analysis scope. Survey duration and report timing are agreed in the proposal.

Can I rent the test equipment instead?

Equipment rental is a separate supporting service. If you need measurements and interpretation performed for you, request an engineering assessment.

Start with a conversation

Start with the asset and your testing objective.

Tell us the asset, location and testing objective. Our engineering team will help define the next step.

Discuss your requirement