Transformer Partial Discharge Testing

DigiStano provides partial discharge diagnostic support for power and distribution transformers. The scope considers transformer construction, available connections, site interference and the reason for the investigation.

Plan the measurement

Start with the asset and the question.

Tell us whether you are preparing for commissioning, investigating a concern or establishing a condition baseline.

  • Transformer type, rated voltage and power rating
  • Reason for the investigation and operating history
  • Existing diagnostic reports and relevant alarms
  • Available measurement connections and outage constraints

Engineering scope

From the test plan to the findings.

  1. Review

    Review asset information and previous diagnostic evidence.

  2. Plan

    Agree the measurement scope, access and responsibilities.

  3. Assess

    Review observed activity with relevant test or operating conditions.

  4. Explain

    Discuss observations, limitations and suitable follow-up.

Project requirements

A scope you can review before the visit.

Agree the assets, measurement approach, access, applicable project specifications and reporting requirements.

Does a PD measurement give the complete condition of a transformer?

PD testing addresses one aspect of insulation behaviour. It should be considered alongside operating history, other diagnostic results and the assessment objective.

What should the report address?

Agree the reporting requirements in the proposal: asset identification, test arrangement, relevant conditions, observations, interpretation, limitations and recommended follow-up.

Before you request testing

Prepare your PD testing request

Use our checklist to share the asset details, access constraints and objective so the engineering team can scope your assessment accurately.

Open the checklist

Start with a conversation

Plan your power transformers assessment.

Tell us the asset, location and testing objective. Our engineering team will help define the next step.